WWTP OT Network

Plant PLC and HMI network · SCADA, PLC-IO, Operations, RIO and MBR rings · redundant ControlLogix · VTScada · IDMZ
00:00:00

Use the view switch above the map to show the SCADA network or the Operations network, and the legend to add or remove individual networks; the map re-frames to what is visible. Buildings 3–5 are hidden until you select them. Disconnect a cable or switch off a device and watch the rings heal and the treatment cards respond. Everything is reversible with “Clear all faults”.

Click a cable to disconnect or reconnect it · click a device for options · drag to move, scroll or pinch to zoom
SCADA network PLC-IO network Operations network RIO ring MBR RIO ring PLC redundancy sync Server rack DMZ / IT Hide all Show all Rings only (switches) Security boundary Standby port Broken

How is treatment doing?

Try a scenario

A scenario applies faults to the live model. Then use the recovery controls to keep water moving, and watch the treatment cards respond.

Recovery controls

How the rings behave: in normal operation the ring supervisor keeps one of its two ring ports on standby so there is no loop. When one cable breaks, the supervisor opens that standby port within a few milliseconds and traffic beyond the break simply flows the other way around. A failed node looks like a single break to the ring. Two separate breaks split the ring, and anything outside the supervisor's piece loses ring connectivity. If the supervisor itself fails, the backup supervisor takes over.

DeviceBuildingTypePowerSeen by SCADASeen by PLCOn Ops net